A Selection of Recent Projects

 

 

 

Travis Perkins - Shell Works Sevenoaks

 

New industrial unit near Bat and Ball Station for Travis Perkins.

 

Snowflake Gelato - Westfield Shopping Centre

 

New food court kiosk for Snowflake Gelato.  Works completed out of hours within 5 nights to meet tight deadline for opening two weeks before Christmas.  

Queenswood School, Hatfield - New sports centre

 

Design and build for new multi function 2 storey 'Ball Hall' sports centre complete with cardio and aerobic studios and changing facilities

St Dunstan's School - Catford

 

Change of use of old pavillion into Wellness Centre comprising offices, first aid, chaplain, kitchen, showers and WCs

 

 

Thrive Festival Tonbridge Kent - Temporary event power

 

Supply and provision of temporary event power using 20KVA generator for food festival in Tonbridge Kent

 

 

 

St James Primary School - Isle of Grain

 

Complete new build of central section of school.  Full design and build including lighting design, fire alarm, door access, intruder alarm and CCTV

 

 

Before

 

 

Installation of wide cable tray

 

 

Marketing Company - London E1

 

Lighting design for marketing company.  Light levels were initially very poor and gloomy.  Brief was to incorporate an element of flexibility into lighting layout and give an 'industrial feel' to the install.  Achieved via installation of wide cable tray  

 

Solar Powered Carpark Lighting - School car park, Sevenoaks

 

Installation of solar powered car park lighting to enable dusk to 10.30pm operation.  Full lighting design to light carpark to 3 lux with good coverage, specification and installation.  System will enable intelligent operation of lights to conserve battery power.

 

 

By Chloe - One Tower Bridge

 

Complete refurbishment of site to form By Chloe's second London restaurant. 

 

Project had a very tight turnaround time which was not helped by the strict permitted working hours within the OTB complex.

 

Completed late Spring 2018

 

 

 

 

Lebanese Bakery, Covent Garden

 

Complete refurbishment of old building.  Lebanese Bakery was incorporated specialist lighting controls.  Completed late Spring 2018

 

 

 

 

Tennis and MUGA Court Lighting - Dunton Green

 

Full lighting design to ensure correct light levels and uniformity whilst avoiding light pollution impacting neighbouring properties.

Design comprised 6 no. 8m columns with metal halide floods and PIR control

 

 

Berkeley House, Sittingbourne.  

 

High dependency residential units for young adults.  Works included full lighting design, full fire alarm design and install, nurse call system design and install, photo voltaic panels

 

 

 

Casis' Farm - Cranleigh Riding for Disabled Association

 

New build stabling for riding school.  Full lighting design for stabling and internal sand school extension.  Fire alarm design and install, intruder alarm install

 

 

 

 

 

 

 

Grab Thai - Leadenhall Market

 

Refurbishment of existing building into new thai fast food restaurant complete with fire alarm and HVAC controls and wiring.

 

 

Deptford Arches

 
Installation of retail outlet A/C units and Extract system for food outlets at Deptford Arches development 
  • Safety Systems

Extract system with gas interlocks to BS 6173

  • Fan Control

Installation of Speed controllers (Step Transformer & Invertor)

  • Oil, Smoke & Grease Filtration

Electrostatic Precipitators or ESP’s. These units utilise an ionisation process to filter particles in the exhaust down to submicron level, with efficiency of up to 98% when fitted correctly.

  • Odour Control

Ultra Violet Ozone Generators. To efficiently control the gaseous phase 

 

Weald of Kent Grammar School, Tonbridge - New Sports Centre

 

Our second Ball Hall Project for a new build sports centre comprising a 2 storey building accommodating a multi use sports hall (4 badmington courts plus gymnastics area), automated bleacher seating, studio, office, reception, lounge, kitchen, first aid, changing rooms and toilets.

 

Again engaged on a design and construct basis and providing full lighting design.  As with any multi-use sports centre lighting must be appropriate to accommodate CIBSE recommendations for individual sports as well as being located so as not to interfere with play or cause glare.

 

The facility includes: 

 

  • Four badminton court sports hall
  • Fully fitted integrated gymnastics area with landing pit and supplementary artistic gymnastic sprung flooring
  • Retractable bleacher seating
  • Dance studio
  • Café/teaching area
  • Changing facilities

 

Completed October 2016, on time and on budget.

 

Total project cost £2.1m

 

 

Radnor House, Sevenoaks - New Science Block

 

Change of use of listed building into new state of the art Science Block comprising:

Chemistry lab, Physics lab, Biology lab

Chemical Store, Chemical Prep

Classroom, A Level Study room

 

Full electrical installation including data, controls, fire system

Lighting design to meet CIBSE recommendations for lighting levels and glare

 

Completed within 3 months to ensure fully operational for the start of the new school year

 

St Andrews Prep School, Eastbourne - New sports centre

 
We were engaged on a design and construct basis.  To include full lighting design required to meet CIBSE recommendations for lighting of sports hall for specific sports and full emergency lighting design.
 

New building to comprise:

  • 4 badmington court sports hall
  • Dance studio
  • First Aid room
  • Changing rooms
  • Toilets
Project duration:  8 months.  Completed on time and on budget

 

Snowflake Gelato - South Kensington

 

Full electrical installation including CCTV, intruder system, emergency lighting and fire system.

Project had a very tight turnaround time requiring out of hours working.

 

Project completed on time and on budget

Older Projects

 

 

The collective - Grade II listed office block in central London - refurbishment into offices plus additional 'hot desk' cafe facility

 

Kent House, Ashford.  NHS Commercial complete refurbishment of 2 floors to include lighting upgrade, data, fire system interface, air conditioning.  Project complicated by 24 hour on site call centre restricting noisy works to narrow window.

 

Grab Thai - London.  Below ground electrical installation to accommodate mechanical plant an kitchen equipment including all controls

 

Octavious House, London.  Installation for plant and air conditioning including controls

 

Kent and Canterbury Hospital, waiting room refurbishment

 

Fleming Howland show rooms, Chelsea Harbour.  Electrical installation including display lighting

 

South Lawns, Reigate.  Residential apartment block, car park and exterior lighting

Print Print | Sitemap